**D0 — Emergency Response:** 1,200 units of Lot#A382 quarantined at warehouse. Customer notified within 2 hours.
**D1 — Team:** J. Zhang (QE Lead), M. Chen (Design), R. Patel (Process), S. Kumar (Supplier Quality)
D2 — Problem Description (5W2H):
D3 — Containment:
D4 — Root Cause (5-Why):
1. Why solder crack? → Void >25% in FET drain pad solder joint
2. Why >25% void? → Reflow profile temperature ramp too fast
3. Why too fast? → Oven zone 3 thermocouple reading 15°C low
4. Why reading low? → Thermocouple not replaced at 6-month interval
5. Why not replaced? → PM schedule didn't include reflow oven thermocouples
**TRC:** Solder void >25% due to incorrect reflow temperature
**MRC:** PM schedule excluded reflow oven critical sensors
**Escape Point:** AOI specification allowed 30% void (exceeding design requirement of 15%)
**D5 — PCA Verification:** New reflow profile validated with X-ray on 500 boards — 0% voids >15%
**D6 — Implementation:** PM schedule updated, AOI void threshold lowered to 15%
**D7 — Prevention:** FMEA updated, all reflow ovens audited across 3 production lines
**D2 — Problem:** Thermal runaway at 85% load after 200h continuous operation. 4% failure rate.
**D4 — Root Cause:** FET gate driver IC latch-up at elevated temperature (85°C) due to insufficient dead-time in PWM control → 5-Why traced to IC datasheet errata not reviewed during design review → MRC: design review checklist missing component errata verification step.
1. **Specific problem description** — Data and measurements, not adjectives
2. **Evidence-based root cause** — 5-Why verified with data at every link
3. **TRC and MRC both identified** — Technical AND management root causes
4. **Verified corrective actions** — Capability studies, pilot runs, data
5. **Systemic prevention** — FMEA updates, horizontal deployment, standards changes
1. Real 8D examples show the complete D0-D8 structure
2. Every D4 must separate TRC from MRC
3. Data beats opinions — verify every 5-Why link
4. D7 must update FMEA and deploy horizontally
5. A good 8D is a communication tool, not just paperwork