D6 — D6: Implementing Permanent Corrective Actions

Part of the 8D methodology (D0–D8).

← D5    D7 →

Discipline 6 (D6) is the execution phase. This is when the verified solution from D5 is rolled out to the entire production environment. Once D6 is confirmed, the temporary walls of D3 can be removed.

How Do You Validate Without Disrupting Production? D6 requires a project management approach: - ECN (Engineering Change Notice): Formalizing the change in the system. - Tooling Updates: Modifying molds, jigs, or fixtures. - Training: Updating the Standard Operating Procedures (SOP) and training all relevant operators.

What's a Good Rollback Plan? Validation is different from D5's verification. It is proof that the solution works over time in the real world. - Long-term Capability Studies (Cpk): Showing that the process is stable and centered. - Successive Batch Monitoring: Confirming zero defects over multiple shifts.

Who Signs Off on Implementation? Only after D6 validation is complete can the D3 containment be stopped. This saves the company money and signals that the "emergency" is over.